Monday, March 10, 2008

Basement

The basement is trucking right along. This weekend I had class. I am taking a class that runs for three weekends, but when I am finished, I have 3 credits...so hard to pass up. I went to class from 5-10pm Friday, and then 8-5pm Saturday. Gona and Baca came down to help Josh install a fan in the soon to be downstairs bathroom.

--I am glad I wasn't home to see them drilling into the hard wood floor in the closet--

Later that day, Aunti Em, Tali and Kade came over. Auntie Em watched Mac and the kids played video games and made brownies. Then, they all headed south to watch Mark go skydiving, and to bring brownies to the skydiving crew.

--Quite the photogenic crew--

After Saturday, the bathroom was completely prepped for the plumbers to come today. Josh and Baca ran a fan, and got the room ready for the tub to be installed. Today, the plumbers came out at 7:30. They ran water to where the sink will be, and installed pipes to vent out the smelly toilet water. They installed the tub and will be back out once we have the drywall done, and the toilet picked out to finish.

--Here is the fully installed, fully functional, very dirty shower--

--doesn't look like much, but lots of pipes and vents, going lots of places--

Basement is really coming together. Mark came out and went over all the electrical plans with Josh, so the next few weekends will be running electrical, finishing the mechanical room, and framing the few walls that we have left. Can't wait until its done!

No comments: